May 6.1987-Tunnel through one of the world's top ten tunnel Dayaoshan
Ninth April (Dingmao to), May 6, 1987, one of the world's top ten tunnel Dayaoshan tunnel through. tunnel in
Dayaoshan Beijing-Guangzhou railway Heng wide (Hengyang to Guangzhou) double-track the Pingshi to Lechang between, from north to south to wear Dayaoshan located within Lechang City, Guangdong Province, a total length of 14.295 km, is currently the longest two-lane the electrified tunnel, its length railway tunnel in the world 10th. Tunnel "triclinic pricked" the construction program, pass through the tunnel in central 9 # fault lot 465 meters long, the largest inflow of up to 4200 tons per day and night, lots of the control of the whole tunnel. The tunnel full use of the new Austrian law principles of construction, the highest single-port the first month alone into a hole 217 lane meters. Started in November 1981, to tunnel through May 6, 1987, and completed in December 1989. By the National Science and Technology Progress Award Grand Prize.
<<< Previous Article (11-24) Next Article >>>
-
...No comments so quickly get number one!
>>history comment
>>every 24th one year
- what happened on January 11th in History
- what happened on February 11th in History
- what happened on Marcy 11th in History
- what happened on April 11th in History
- what happened on May 11th in History
- what happened on June 11th in History
- what happened on July 11th in History
- what happened on August 11th in History
- what happened on September 11th in History
- what happened on October 11th in History
- what happened on November 11th in History
- what happened on December 11th in History